MODAPS PCR 13-008

PCR Number 13-008
Date 2013-05-31
Initiator Gang Ye
Abstract PGE122 v51.0.2 was updated to avoid PGE122 failures by correcting the calender function that would not work with IDL 8.
Problem Statement A calendar function would not work with IDL 8.
Description of Change Statement “caldat” was replaced by statement: “tyyyy=fix(string(tjd,format='(C(CYI4.4))'))”
Products Affected No products are effected by this is a functional fix. The MOD_PRCOR04 step was modified with the above fix.
Software Affected PGE122 v51.0.2[AP]M1M/AMPM_CA9nrtm 4.0.2
Processing String to Receive the Change Terra Forward, Terra/Auqa Combined, Aqua Forward
Downstream Product Effects No downstream products are affected.
Data Granules to be Used for Science Testing Sci Test running on nrt2 shows expected result.2010-059
Justification Avoid PGE122 failure, No change to M*DAODHD product.
Effective Date for Implementation of Change 2013-06-03
Status Gang Ye and Ed Hyer (PGE122 developer) approved on 05/31/2013.