MODAPS PCR VNP 26-001

PCR Number VNP 26-001
Date 2026-04-09
Initiator Davidson, Carol
Abstract PGE536 2.0.6, PGE617 2.0.5, PGE657 2.0.3

PGE536/GPP v2.0.6 and PGE617/Evapotrans v2.0.5 to be used in reprocessing JPSS2 from 2023/001 to leading edge, which is to end of 2025. The initial runs will be for the gap-filled variations and will include running the JPSS2 version of PGE657/GF LAI/FPAR, version 2.0.3. For data beyond end of 2025, the non-gap filled versions will be used.

Problem Statement Initial version of VIIRS JPSS2 GPP and Evapotranspiration PGEs, PGE536 and PGE617, for use in the JPSS2 Collection 2 reprocessing. Versions of each align with those in use for JPSS1 and SNPP.
Description of Change PGE536/GPP v2.0.6 and PGE617/Evapotrans v2.0.5 to be used in reprocessing JPSS2 from 2023/001 to leading edge, which is to end of 2025. The initial runs will be for the gap-filled variations and will include running the JPSS2 version of PGE657/GF LAI/FPAR, version 2.0.3. For data beyond end of 2025, the non-gap filled versions will be used.
Products Affected JPSS2 C2 GF GPP and ET Products
Software Affected PGE536 2.0.6, PGE617 2.0.5, PGE657 2.0.3
Processing String to Receive the Change J2 Forward Processing. J2 Reprocessing.
Downstream Product Effects All VIIRS land products
Data Granules to be Used for Science Testing Science testing was conducted using JPSS2 variations of PGE657, PGE536 and PGE617. The datasets were reviewed by LDOPE and the science team. Sample gap-filled outputs were shared with LP DAAC for review and approved. Note that only the gap-filled variations of PGE536 and PGE617 were tested, and the non-gap-filled need to be tested and samples shared with LP DAAC prior to those datasets being generated and sent to LP DAAC.
Justification Official J2 C2 product generation for gap-filled GPP and Evapotrans.
Effective Date for Implementation of Change PGEs to be used for generating Gap-Filled datasets for JPSS2 from BOM through end of 2025 starting production 4/8/2026. These same PGEs will be used for leading edge production of non-Gap-Filled datasets for 2026 data, which will begin once the gap-filled products have been completed.
Status Sadashiva Devadiga approved 04/24/2026. Carol Davidson implemented 04/09/2026.